What are the current assessments for?
We currently have 2 assessments on our maintenance bill. Below is a breakdown of each.
- The line labeled ‘Assessment’ is an operating assessment. This is for the lack of tenant in the old gym space which is located behind the two vacant front spaces. The two vacant front spaces DO NOT belong to us. They were sold many years ago and we are unable to buy them back at this time. This assessment will continue until we have a paying tenant to replace the missing income. The board is doing everything in it’s power to find a tenant to rent the vacant space.
- The line labeled ‘Capital Assessment’ is for our long term capital improvement projects. There are many projects in this assessment
- Phase 1
- Local Law 11
- Lobby Renovation
- Main Roof & Bulkhead Replacement
- Domestic Hot Water Pump
- Ventilation Ductwork Liner Application
- Gym
- Submetering
- Ventilation System
- Hot / Chilled Water Loop Pump & Space Pump Replacements
- Fire Stopping
- Localized Valve Replacement
- Corridor Air Supply Unit Replacement
- Cooling Tower Loop Pump Replacement
- Plumbing Work
- Installing Refuse Chute Exhaust Fan
- Phase 2
- Window Replacement
- Commercial Space Roof
- Apartment Entry Door Air-Sealing
- Boilers and Boiler Feed Water Unit Replacement
- Centrifugal Chiller Replacement
- Roof Deck
- Phase 1
Click here for a PDF with a description of the estimated percentages for each project. Please note that all of this is subject to change.